This is the bill as Congress filed it, with every figure linking back to the official record. Say how you\u2019d vote on it before the floor vote happens, and VoteWire will show you what your own representatives did. How it works →
Floodplain Enhancement and Recovery Act
Latest action (Oct 5, 2026) — Held at the desk.
What it does
Congressional Research Service, Sep 30, 2026This bill eases restrictions for ecosystem restoration projects in designated floodways that meet certain risk criteria.
Under current National Flood Insurance Program requirements, such projects are generally prohibited in a designated floodway if the project would increase the area’s base flood elevation.
The bill establishes conditions under which a community may permit an ecosystem restoration project within a designated floodway that would result in an increase in base flood elevations. Specifically, the project may be permitted if (1) a professional engineer determines that the cumulative effect of the increase will be not more than 1 foot; (2) no insurable structure or critical infrastructure is located in an impacted area; and (3) the community submits an analysis to the Federal Emergency Management Agency on the project’s effects after the project is complete.
An ecosystem restoration project is defined by the bill as a project that manipulates the physical, chemical, or biological characteristics of a site with a goal of recovering, reclaiming, or improving the functions of an aquatic resource or floodplain.
Face Value
as introducedHow much of this bill its name accounts for.
- Every bill starts at100
- Nothing counted against it: one area of law, and short enough that length doesn't register.
Face Value measures reach, not honesty. A big bill can be accurately named, and a low score is not an accusation — it means the contents reach further than any short title could describe. Count it yourself ↗ How this is worked out
Discussion
4 commentsSign in to join the discussion and put your vote on the record.